Birds like picking their seeds that they throw into it back out, and I think the neighbors cats gotten into it a couple times. Working on some critter guards, but I’ve been spending my time modifying under the deck for a larger dog run for when I get a new dog. The sheds new, still in progress, need probably 8 more yards of rock underneath as well.

Slowly but surely, this week is a rest week though.

  • SchmidtGenetics@lemmy.worldOP
    link
    fedilink
    English
    arrow-up
    6
    arrow-down
    1
    ·
    4 months ago

    July 5 is the expected completion date, while they were inspecting the rest of the main they found 5 other spots that wouldn’t survive being repressurized. So while the original break is repaired and filled back in, they are still underway on the others.

    It’s supposed to rain 30-40mm tomorrow, so my barrels and totes should be refilled at least.