You always hear the phase “9 to 5” and also the song with the same name. Assuming you include 1 hour worth of breaks (30 minute lunch and two 15 minute breaks), you’re only working for 7 hours a day which comes up to 35 hours a week.

Now it feels like you have to work 8 hours a day (for a total of 40 hours of actual work), plus your other time off meaning you’re really there for 9 hours each day (for a total of 45 hours). Am i looking at that wrong, or did expected times change, and if so, when?

  • LordGimp@lemm.ee
    link
    fedilink
    arrow-up
    10
    arrow-down
    2
    ·
    21 hours ago

    Your math ain’t mathing.

    The stereotypical “9 to 5” is an 8 hour shift with a paid hour “lunch break”. This includes two 10-15 minute breaks, which are also paid. You come to work at 9, do work, take breaks, take lunch, and then leave at 5. That’s 8 hours.

    My job is 8 to 430. I come in at 8, work till 12, then I have a half hour unpaid lunch. The unpaid lunch means I cannot be required to stay on site, which can happen with a paid lunch. Then from 1230 to 430 I work until I go home. There are two 10 minute paid breaks in there. I work 8 hours total in an 8.5 hour work day.