NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.

Wonder why they’re building these instead of thermal coal plants

  • GenEcon@lemm.ee
    link
    fedilink
    arrow-up
    12
    ·
    10 months ago

    It took India 16 years from planning to operation. So it will not only be cheaper, but a lot faster as well.