NPCI is building two 700MW pressurised heavy water reactors (PHWR), including Units 3 and 4 at Kakrapar, where there are two 220MW power plants. Officials say that in July, the fourth unit recorded 97.56% progress.

Wonder why they’re building these instead of thermal coal plants

  • roguetrick@kbin.social
    link
    fedilink
    arrow-up
    1
    ·
    edit-2
    10 months ago

    Truth is if the economics are there, tritium is not a problem. You just put lithium-6 in a reactor with an irradiation channel and breed it that way (its what the soviets did in many reactors including Chernobyl). All lithium-6 is currently used to make fusion bombs, though.