• khannie@lemmy.world
    link
    fedilink
    English
    arrow-up
    7
    ·
    11 months ago

    So I run a small company that took part in a 4 day week trial in conjunction with a university. The goal was to set staff up with the tools necessary to achieve their full week of work in four days and measure whether it was being achieved while looking at other measurable metrics (e.g. absence through illness)

    It was an unqualified success and we’ll never go back. The drive to keep a three day weekend coupled with the freshness of rolling into work after one meant everyone was absolutely hitting the same productivity levels.

    Like there’s no need to fuck around on Reddit or Lemmy if you’re well rested and trying to make sure you keep that going.