Birds like picking their seeds that they throw into it back out, and I think the neighbors cats gotten into it a couple times. Working on some critter guards, but I’ve been spending my time modifying under the deck for a larger dog run for when I get a new dog. The sheds new, still in progress, need probably 8 more yards of rock underneath as well.

Slowly but surely, this week is a rest week though.

    • SchmidtGenetics@lemmy.worldOP
      link
      fedilink
      English
      arrow-up
      6
      arrow-down
      1
      ·
      5 months ago

      July 5 is the expected completion date, while they were inspecting the rest of the main they found 5 other spots that wouldn’t survive being repressurized. So while the original break is repaired and filled back in, they are still underway on the others.

      It’s supposed to rain 30-40mm tomorrow, so my barrels and totes should be refilled at least.