I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

  • lud@lemm.ee
    link
    fedilink
    arrow-up
    4
    ·
    5 hours ago

    Trains with hoppers are not present on all railways though.